archive-edu.com » EDU » C » CALTECH.EDU

Total: 352

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • LIGO Press & Media Kit: Chronology
    1998 40 Meter interferometer operated with LIGO optical configuration First completed mirrors arrive at LIGO 1999 First module at Livingston completes bake LIGO inauguration ceremony 2000 Completed installation of interferometer components for Hanford two kilometer interferometer Completed the bake of beam tube s at Livingston Achieved first lock on Hanford 2 km interferometer in recombined configuration with both Fabry Perot arms 2001 Achieved first lock on Hanford 2 km interferometer in power recycled configuration E7 Engineering run first coincident operation of all interferometers plus GEO600 interferometer in Germany and LSU bar detector 2002 First data collection Observation S1 employing all three LIGO interferometers in conjunction with the GEO600 and TAMA300 Japan interferometers 2003 Second Observation S2 operating with TAMA300 interferometer Third Observation S3 operating with GEO600 and TAMA300 interferometers 2004 Installation of active anti seismic system at LLO Hanford interferometers approach design sensitivity 2005 LIGO design sensitivity achieved Start of Observation 5 S5 a cumulative year long data run at design sensiivity 2006 Science Education Center inaugurated at the LIGO Livingston Observatory 2007 Agreement for joint data analysis ratified between LIGO and Virgo Italy Joint observation commences with Virgo S5 ends one year two site coincident data at design sensitivity

    Original URL path: http://www.ligo.caltech.edu/LIGO_web/PR/scripts/chrono.html (2015-06-02)
    Open archived version from archive


  • LIGO Press & Media Kit: LIGO photos
    LHO Entrance Entrance to the LIGO Hanford Observatory LHO LIGO Hanford LHO Grounds Observatory grounds LHO LIGO Hanford LHO Building Side shot of the LHO Building Mid station Mid station LHO LIGO Livingston LLO Interferometer LIGO Livingston Observatory LLO Interferometer LIGO Livingston LLO interferometer Inside the interferometer LLO LIGO Livingston LLO Arm Interferometer arm outside view LLO LIGO Livingston LLO Grounds Interferometer grounds LLO LIGO Livingston LLO End station Interferometer

    Original URL path: http://www.ligo.caltech.edu/LIGO_web/PR/scripts/photos.html (2015-06-02)
    Open archived version from archive

  • LIGO Visitor Information: Maps, directions, area information
    lodging restaurants weather site contact home LIGO Laboratory MS 100 36 Caltech 1200 E California Blvd Pasadena CA 91125 USA Tel 1 626 395 3064 LIGO is supported by the

    Original URL path: http://www.ligo.caltech.edu/~veronica/travel/ (2015-06-02)
    Open archived version from archive

  • NSF reviews of LIGO | Caltech | MIT
    Review April May 2013 3rd Interferometer Storage Plan Review April 2013 Advanced LIGO Review April 2012 Advanced LIGO Review April 2011 Advanced LIGO Review April 2010 Advanced LIGO Review November 2008 Advanced LIGO Final Readiness Review November 2007 Advanced LIGO Baseline Update Review June 2007 Advanced LIGO Review May June 2006 Advanced LIGO Review June 2003 Advanced R D Review January 2001 Annual LIGO reviews Advanced LIGO and Operations Review

    Original URL path: http://www.ligo.caltech.edu/NSF/sitemap.shtml (2015-06-02)
    Open archived version from archive

  • LIGO reviews by NSF
    Indigo Maps and directions 200 Convention Street Baton Rouge LA 70801 Book now Rate 94 night Reservation group rate code LIG Rate cutoff date May 29 Reservations by phone Request LIG group code 1 877 8 INDIGO toll free 225 343 1515 local Transportation Indigo Hotel provides free shuttle service to from the Baton Rouge airport Call the hotel front desk at 225 343 1515 for pickup Driving directions from Baton Rouge Airport to Hotel Indigo Parking at the hotel Valet parking at 16 night Travel Procedures The TSA air travel security rules remain in effect Travel Assistance For LIGO Lab staff and invitees please feel free to make your own travel arrangements or contact Carolyn Peterson or Morgan Dalton for travel assistance Carolyn Peterson LIGO Travel Assistance 509 372 8300 ext 416 Office 509 372 8137 Fax Morgan Dalton FCm Travel Solutions 213 430 4700 Phone 213 627 1053 Fax 877 990 2677 Toll free 866 790 7523 24 hr emergency assist Toll free in US and Canada Travel Reimbursement For invitees supported by the LIGO Lab Please submit your travel expenses to Carolyn Peterson Meals and Dinner Dining options at the hotel or in the Baton Rouge area

    Original URL path: http://www.ligo.caltech.edu/NSF/info.06.2015.shtml (2015-06-02)
    Open archived version from archive

  • Hanford Facilities As-Built Drawings
    Rev 2 D960243 02 O Corner Station Utility Plan WA C 510 Rev 1 D960244 01 O Corner Station Utility Plan Enlarged Plans Top of Page Electrical WA E 001 Rev 1 D960388 01 O Standard Symbols Abbreviations Acronyms WA E 002 Rev 1 D960389 01 O Standard Plan Symbols WA E 003 Rev 1 D960390 01 O Standard Schematic Wiring Diagrams Symbols WA E 004 Rev 1 D960391 01 O Standard One Three Line Diagram Symbols WA E 007 Rev 1 D960392 01 O Schedules Material WA E 008 Rev 2 D960393 02 O Typical End or Mid Station Single Line Diagram WA E 105 Rev 2 D960394 02 O Corner Station OSB Office Area Receptacle Power Plan WA E 106 Rev 2 D960395 02 O Corner Station OSB Lab Area Receptacle and Power Plan WA E 107 Rev 2 D960396 02 O Corner Station OSB Office Area Lighting Plan WA E 108 Rev 2 D960397 02 O Corner Station OSB Lab Area Lighting Plan WA E 109 Rev 2 D960398 02 O Corner Station Communications Riser Diagram WA E 110 Rev 2 D960399 02 O Corner Station OSB Office Area Fire Detection Security Plan WA E 111 Rev 2 D960400 02 O Corner Station OSB Lab Area Fire Detection Security Plan WA E 112 Rev 1 D960401 01 O Corner Station Chiller Plant Maintenance Building Grounding Plan WA E 113 Rev 1 D960402 01 O Corner Station Chiller Plan Maintenance Building Power Lighting Plans WA E 114 Rev 1 D960403 01 O Corner Station LVEA Areas 101 102 103 104 Details WA E 115 Rev 2 D960404 02 O Corner Station OSB Lighting and Power Panel Schedules WA E 116 Rev 2 D960405 02 O Corner Station OSB Lighting and Power Panel Schedules WA E 117 Rev 1 D960406 01 O Corner Station Mechanical Room Lighting and Power Panel Schedules WA E 118 Rev 1 D960407 01 O Corner Station LVEA VEAC Panel Schedules WA E 119 Rev 1 D960408 01 O Corner Station LVEA VEAC Panel Schedules WA E 120 Rev 1 D960409 01 O Corner Station LVEA VEAC Panel Schedules WA E 121 Rev 1 D960410 01 O Corner Station LVEA CDSAC Panel Schedules WA E 122 Rev 1 D961201 01 O Corner Station LVEA OSB Panel Schedules WA E 201 Rev 2 D960411 02 O Mid End A Stations Lighting Communications Fire Detection Plan WA E 202 Rev 1 D960412 01 O Mid End A Stations Lightning Grounding Plan WA E 203 Rev 2 D960413 02 O Mid End A Stations Underground Plan WA E 204 Rev 2 D960414 02 O Mid End A Stations Aboveground Power Plan WA E 205 Rev 2 D960415 02 O Mid End A Stations Panel Schedules WA E 206 Rev 1 D960416 01 O Mid End A Stations Panel Schedules WA E 211 Rev 2 D960417 02 O Mid End A Stations Lighting Communications Fire Detection Plan WA E 212 Rev 1 D960418 01 O Mid End B Stations Lightning Grounding Plan WA E 213 Rev 2 D960419 02 O Mid End B Stations Underground Plan WA E 214 Rev 2 D960420 02 O Mid End B Stations Aboveground Power Plan WA E 400 Rev 1 D960421 01 O Corner Station Underground Sections WA E 401 Rev 1 D960422 01 O Corner Station Details WA E 402 Rev 1 D960423 01 O Corner Station Grounding Schematic WA E 404 Rev 1 D960424 01 O Details WA E 405 Rev 1 D960425 01 O Grounding Details Sheet 1 WA E 406 Rev 1 D960426 01 O Grounding Details Sheet 2 WA E 407 Rev 1 D960427 01 O Grounding Details Sheet 3 WA E 408 Rev 1 D960428 01 O Lightning Protection Details WA E 409 Rev 1 D960429 01 O Sections and Details WA E 501 Rev 1 D960430 01 O Corner Station 3rd Interferometer Single Line Diagram WA E 502 Rev 1 D960431 01 O Corner Station 3rd Interferometer Single Line Diagram WA E 503 Rev 1 D960432 01 O Corner Station 3rd Interferometer LVEA Receptacle Power Plan WA E 504 Rev 1 D960433 01 O Corner Station 3rd Interferometer LVEA Receptacle Power Plan WA E 505 Rev 1 D960434 01 O Corner Station 3rd Interferometer LVEA Lighting Plan WA E 506 Rev 1 D960435 01 O Corner Station 3rd Interferometer LVEA Grounding Plan WA E 507 Rev 2 D960436 02 O Corner Station 3rd Interferometer Power Lighting Parking Observation Plan WA E 508 Rev 1 D960437 01 O Corner Station 3rd Interferometer Panel Schedules WA E 509 Rev 1 D960438 01 O Corner Station 3rd Interferometer Panel Schedules Top of Page General WA G 001 Rev 2 D960193 02 O Cover Drawing Index Sheet 1 WA G 002 Rev 2 D960194 02 O Drawing Index Sheet 2 WA G 003 Rev 2 D960195 02 O Drawing Index Sheet 3 Top of Page HVAC WA H 001 Rev 1 D960343 01 O Legend Abbreviations WA H 002 Rev 1 D960344 01 O Legend General Notes WA H 003 Rev 1 D960345 01 O Equipment Schedules Sheet 1 WA H 004 Rev 2 D960346 02 O Equipment Schedules Sheet 2 WA H 005 Rev 1 D960347 01 O Equipment Schedules Sheet 3 WA H 006 Rev 1 D960348 01 O Equipment Schedules Sheet 4 WA H 007 Rev 1 D960349 01 O Control System Diagram WA H 113 Rev 2 D960350 02 O Corner Station OSB Floor Plan Sheet 1 WA H 114 Rev 2 D960351 02 O Corner Station OSB Floor Plan Sheet 2 WA H 115 Rev 1 D960352 01 O Corner Station Chillers Yard Floor Plan WA H 116 Rev 1 D960353 01 O Corner Station Maintenance Building Floor Plan WA H 121 Rev 1 D960354 01 O Corner Station Chilled Water Flow Diagram WA H 122 Rev 1 D960355 01 O Corner Station Air Flow Diagrams Sheet 1 WA H 123 Rev 1 D960356 01 O Corner Station Air Flow Diagrams Sheet 2 Wa H

    Original URL path: http://www.ligo.caltech.edu/LIGO_web/docs/asbuilts_lho.html (2015-06-02)
    Open archived version from archive

  • Livingston Facilities As-Built Drawings
    1 D961276 01 O Southeast Arm Plan and Profile Station 0 00 to Station 14 00 LA C 532 Rev 1 D961277 01 O Southeast Arm Plan and Profile Station 14 00 to Station 28 00 LA C 533 Rev 1 D961278 01 O Southeast Arm Plan and Profile Station 28 00 to Station 42 00 LA C 534 Rev 1 D961279 01 O Southeast Arm Plan and Profile Station 42 00 to Station 56 00 LA C 535 Rev 1 D961280 01 O Southeast Arm Plan and Profile Station 56 00 to Station 70 00 LA C 536 Rev 1 D961281 01 O Southeast Arm Plan and Profile Station 70 00 to Station 84 00 LA C 537 Rev 1 D961282 01 O Southeast Arm Plan and Profile Station 84 00 to Station 98 00 LA C 538 Rev 1 D961283 01 O Southeast Arm Plan and Profile Station 98 00 to 112 00 LA C 539 Rev 1 D961284 01 O Southeast Arm Plan and Profile Station 112 00 to Station 126 00 LA C 540 Rev 1 D961285 01 O Southeast Arm Plan and Profile Station 126 00 to Station 133 00 Top of Page Electrical LA E 001 Rev 1 D960994 01 O Standard Symbols Abbreviations Acronyms LA E 002 Rev 1 D960995 01 O Standard Plan Symbols LA E 003 Rev 1 D960996 01 O Standard Schematic Wiring Diagrams Symbols LA E 004 Rev 1 D960997 01 O Standard One Three Line Diagram Symbols LA E 005 Rev 2 D960998 02 O Overall Single Line Diagram Rev 02 LA E 007 Rev 1 D961000 01 O Schedules Materials LA E 008 Rev 2 D961001 02 O Typical End Station Single Line Diagram LA E 008 Rev 2 D960999 02 O Corner Station Single Line Diagram Rev 02 LA E 100 Rev 5 D961002 05 O Corner Station LVEA Areas 101 103 104 Receptacle and Power Plan Rev 05 LA E 101 Rev 4 D961003 04 O Corner Station LVEA Areas 102 105 Receptacle and Power Plan LA E 102 Rev 1 D961004 01 O Corner Station LVEA Lighting Plan LA E 103 Rev 2 D961005 02 O Corner Station Grounding and Lightning Protection Plan Rev 02 LA E 104 Rev 2 D961006 02 O Corner Station Power Lighting Parking Observation Plan LA E 105 Rev 2 D961007 02 O Corner Station OSB Office Area Receptacle and Power Plan LA E 106 Rev 2 D961008 02 O Corner Station OSB Lab Area Receptacle and Power Plan Rev 02 LA E 107 Rev 2 D961009 02 O Corner Station OSB Office Area Lighting Plan LA E 108 Rev 1 D961010 01 O Corner Station OSB Lab Area Lighting Plan LA E 109 Rev 2 D961011 02 O Corner Station Communications Riser Diagram LA E 110 Rev 2 D961012 02 O Corner Station OSB Office Area Fire Detection and Security Plan LA E 111 Rev 2 D961013 02 O Corner Station OSB Lab Area Fire Detection Security Plan LA E 113 Rev 1 D961015 01 O Corner Station Chiller Plant Maintenance Building Power Lighting Plans LA E 115 Rev 3 D961017 03 O Corner Station OSB Lighting and Power Panel Schedules Rev 03 LA E 116 Rev 3 D961018 03 O Corner Station OSB Lighting and Power Panel Schedules Rev 03 LA E 117 Rev 2 D961019 02 O Corner Station Mechanical Room Lighting and Power Panel Schedules Rev 02 LA E 118 Rev 1 D961020 01 O Corner Station LVEA VEAC Panel Schedules LA E 119 Rev 1 D961021 01 O Corner Station LVEA VEAC Panel Schedules LA E 120 Rev 1 D961022 01 O Corner Station LVEA VEAC Panel Schedules LA E 121 Rev 1 D961023 01 O Corner Station LVEA CDSAC Panel Schedules LA E 122 Rev 1 D961024 01 O Corner Station LVEA OSB Panel Schedules LA E 123 Rev 3 D961479 03 O Corner Station LVEA Areas 101 102 103 104 Details LA E 124 Rev 3 D961480 03 O Corner Station LVEA Areas 101 102 103 104 Details LA E 125 Rev 3 D961481 03 O Corner Station LVEA Areas 101 102 103 104 Details LA E 201 Rev 2 D961025 02 O End Station A Lighting Communications Fire Detection Plan LA E 202 Rev 2 D961026 02 O End Station A Lighting and Grounding Plan Rev 02 LA E 203 Rev 2 D961027 02 O End Station A Underground Plan LA E 204 Rev 2 D961028 02 O End Station A Aboveground Power Plan LA E 205 Rev 3 D961029 03 O End A and B Stations Panel Schedules Rev 03 LA E 206 Rev 1 D961030 01 O End Station A and B Panel Schedules LA E 207 Rev 1 D961031 01 O Mid Station A Grounding Underground Plan LA E 211 Rev 2 D961032 02 O End Station B Lighting Communications Fire Detection Plan LA E 212 Rev 2 D961033 02 O End Station B Lightning and Grounding Plan Rev 02 LA E 213 Rev 3 D961034 03 O End Station B Underground Plan LA E 214 Rev 3 D961035 03 O End Station B Aboveground Power Plan Rev 03 LA E 217 Rev 1 D961036 01 O Mid Station B Grounding Underground Plan LA E 400 Rev 1 D961037 01 O Corner Station Underground Sections LA E 401 Rev 1 D961038 01 O Corner Station Details LA E 402 Rev 2 D961039 02 O Corner Station Ground Schematic Rev 02 LA E 404 Rev 1 D961040 01 O Details LA E 405 Rev 1 D961041 01 O Grounding Details Sheet 1 LA E 406 Rev 1 D961042 01 O Grounding Details Sheet 2 LA E 407 Rev 1 D961043 01 O Grounding Details Sheet 3 LA E 408 Rev 1 D961044 01 O Lightning Protection Details LA E 409 Rev 1 D961045 01 O Sections and Details LA E 505 Rev 0 D961243 00 O Grounding Details LA E 507 Rev 0 D961244 00 O Mid Station A

    Original URL path: http://www.ligo.caltech.edu/LIGO_web/docs/asbuilts_llo.html (2015-06-02)
    Open archived version from archive

  • Hanford Beam Tube Enclosure As-Built Drawings
    Plan BT C 025 Rev A D960719 A O Northwest Arm End Station Plot Plan BT C 026 Rev A D960720 A O Northwest Arm End Station Grading Plan BT C 027 Rev A D960721 A O Northwest Arm End Station Utility Plan BT C 031 Rev 2 D960176 02 O Southwest Arm Plan and Profile Station 0 00 to Station 14 00 BT C 032 Rev 2 D960177 02 O Southwest Arm Plan and Profile Station 14 00 to Station 28 00 BT C 033 Rev 3 D960722 03 O Southwest Arm Plan and Profile Station 28 00 To Station 42 00 BT C 034 Rev 2 D960179 02 O Southwest Arm Plan and Profile Station 42 00 to Station 56 00 BT C 035 Rev 2 D960723 02 O Southwest Arm Plan and Profile Station 56 00 To Station 70 00 BT C 036 Rev 2 D960181 02 O Southwest Arm Plan and Profile Station 70 00 to Station 84 00 BT C 037 Rev 3 D960724 03 O Southwest Arm Plan and Profile Station 84 00 To Station 98 00 BT C 038 Rev 3 D960725 03 O Southwest Arm Plan and Profile Station 98 00 To Station 112 00 BT C 039 Rev 2 D960184 02 O Southwest Arm Plan and Profile Station 112 00 to Station 126 00 BT C 040 Rev 2 D960726 02 O Southwest Arm Plan and Profile Station 126 00 To Station 133 00 BT C 041 Rev A D960727 A O Southwest Arm Mid Station Plot Plan BT C 042 Rev A D960728 A O Southwest Arm Mid Station Grading Plan BT C 043 Rev A D960729 A O Southwest Arm Mid Station Utility Plan BT C 045 Rev A D960730 A O Southwest Arm End Station Plot Plan BT C 046 Rev A D960731 A O Southwest Arm End Station Grading Plan BT C 047 Rev A D960732 A O Southwest Arm End Station Utility Plan BT C 051 Rev A D960733 A O Sitework Details BT C 052 Rev A D960734 A O Grading Sections Details Top of Page Electrical BT E 601 Rev A D960743 A O Mid End Stations B Grounding Plan BT E 602 Rev A D960744 A O Mid End Stations B Underground Plan BT E 603 Rev A D960745 A O Grounding Details Sheet I BT E 604 Rev A D960746 A O Electrical Grounding Details Sheet 2 Top of Page General BT G 00 Rev 0 D960160 00 O Cover Sheet Top of Page Plumbing BT P 601 Rev A D960747 A O Mid and End Stations B Underground Plan BT P 602 Rev A D960748 A O Mid End Stations B Riser Diagram Schematics Top of Page Structural BT S 001 Rev 0 D960186 00 O General Notes Abbreviations and Legend BT S 002 Rev 1 D960187 01 O Key Plan of Beam Tube Enclosure BTE and Partial Enlarged Plan BT S 002A Rev 0 D960188 00 O Key Plan of

    Original URL path: http://www.ligo.caltech.edu/LIGO_web/docs/asbuilts_bte_lho.html (2015-06-02)
    Open archived version from archive



  •