    Brooks Mall terminating at Cedar Street and Conner Hall is in the planning stage Planning Inactive DW Brooks Mall Infrastructure Greenspace With three out of five projected phases completed D W Brooks Mall includes wide sidewalks open grassy areas and trees Upon completion the mall will extend from Conner Hall to the north to Carlton Street to the south Completed Warranty Inactive Double Bridges Farm Academics Research Relocation of sheep beef cattle and swine facilities from South Milledge Avenue to property in Oglethorpe County Completed Warranty Inactive Demosthenian Hall Historic Renovations In 1997 Demosthenian Hall received a 200 000 facelift Financed primarily by alumni donations the construction work restored the Upper Chamber to its original 1824 layout and color scheme while the floors of the Lower Chamber were also uncovered and restored Completed Warranty Inactive Dairy Farm Teaching Building Academics Research OUA is currently conducting a conceptual plan to renovate roughly 50 of the Dairy Farm Teaching Building which was built in the early 1970s Planning Active Coverdell Memorial Garden Infrastructure Greenspace This memorial garden is comprised of some of the late Senator Paul D Coverdell s favorite plants including a Georgia Oak which commemorates the Senator s life of service Completed Warranty Inactive Coverdell Center Academics Research Opened in March 2006 the 140 000 square foot Coverdell Building houses a dynamic interactive mix of disciplines with a unifying focus on problems of biomedical importance Completed Warranty Inactive College of Veterinary Medicine Renovation Phase 2A Academics Research Renovation of the Pathology Areas in the historic College of Veterinary Medicine Building Construction Active first previous 5 6 7 8 9 10 11 12 13 next last Design Construction Active Projects Academics Research Athletics Auxiliary Services Health Sciences Campus Historic Renovations Infrastructure Greenspace Student Affairs 4H and other UGA Satellite Campuses LEED

    Original URL path: http://www.architects.uga.edu/projects/all?page=9&order=title&sort=desc&field_status_value_many_to_one=All&field_phase_value_many_to_one=All&field_type_value_many_to_one=All (2015-06-04)
    Open archived version from archive

  • All Projects | University Architects
    women s basketball and gymnastics teams The history of each sport is commemorated with displays including trophies archives graphics and kiosks Completed Warranty Inactive Clark Howell Hall 2nd Floor Renovation Auxiliary Services The Office of External Affairs is seeking funds to renovate the Career Center located in Clarke Howell Hall The Career Center occupies a majority of the buildings second floor and serves as a hub for students to meet and interview with potential employers The space has many deficiencies due to the buildings age built in 1936 and the proposed renovation addresses these needs Proposed Inactive Center for Molecular Medicine Academics Research The project contemplates a 43 000 square foot addition to the UGA Complex Carbohydrate Research Center CCRC that will be dedicated to and house the Center for Molecular Medicine CMM There will be around thirteen 1 200 sf laboratories along with shared support space cell culture facilities environmental rooms microscopy space faculty offices a 1 200 sf conference room and a roughly 7 500 sf vivarium Design Active CCRC Academics Research Completed in 2003 the Complex Carbohydrate Research Center is a focal development within the Riverbend Research Village The building is over 120 000 sq ft and provides the Center with a leadership position within the growing field of medical glycobiology and glycotechnology Completed Warranty Inactive Carnegie Library Historic Renovations Programming Active Candler Hall Historic Renovations In 2003 Candler Hall underwent extensive renovations restoring some of its historic features that were changed or removed during past renovations The restoration effort has garnered numerous awards Completed Warranty Inactive Campus Upgrades Transit ADA Infrastructure Improvements Health Sciences Campus Completed Warranty Inactive Campus Upgrades George Hall Health Sciences Campus This project includes a minor renovation of George Hall to address life safety and ADA code compliance in the 360 seat

    Original URL path: http://www.architects.uga.edu/projects/all?page=10&order=title&sort=desc&field_status_value_many_to_one=All&field_phase_value_many_to_one=All&field_type_value_many_to_one=All (2015-06-04)
    Open archived version from archive

  • All Projects | University Architects
    UGA Satellite Campuses Repair and stabilize the stream bank and provide a restored habitat for wild oysters on Horsepen Creek at Burton 4 H Center Design Active Burton 4 H Center Biltmore Hole Cabin Renovations 4H and other UGA Satellite Campuses Renovation of two Staff cabins at Burton 4 H Center Design Inactive Building 1516 Student Housing Student Affairs Building 1516 provides double and single rooms with private bath accommodations geared toward non first year undergraduate students The new dorm recently achieved LEED Gold Certification making it the second UGA building to achieve this status http housing uga edu residence tour reed building 1516 Completed Warranty Inactive Building 1512 Fresh Air Renewal Replacement Student Affairs Scope included upgrades to the building s fresh air system along with several interior components including paint counter top replacements re flooring and bathtub replacements Completed Warranty Inactive Broad Street Studios Academics Research When an old futon store and bicycle shop were renovated in 2001 the Broad Street Studios became home to the School of Art s Interior Design program and Undergraduate Drawing and Painting Completed Warranty Inactive Bolton Dining Hall Auxiliary Services This project will develop a new 67 000 sq food service facility Construction will include space for an expanded meal plan operations facility retail food sales space catering facilities and administrative office space Completed Warranty Inactive Baseball Stadium Renovation Phase I Athletics Design Inactive Baseball Stadium Renovation Athletics The renovation of the Baseball Stadium included the reconstructing and expansion of the press box raising of the concourse level and expanding the dugout level through excavation The facility has two club areas one at the press level and a Dugout Club with seats directly behind home plate A centralized stairwell and the addition of an elevator provides convenient access to all levels of

    Original URL path: http://www.architects.uga.edu/projects/all?page=11&order=title&sort=desc&field_status_value_many_to_one=All&field_phase_value_many_to_one=All&field_type_value_many_to_one=All (2015-06-04)
    Open archived version from archive

  • All Projects | University Architects
    two restroom facilities along with a new concessions building In addition the large plaza area offers both a place to congregate and a convenient east west passageway This outdoor area is made available to Student Affairs to utilize as programming space throughout the year Completed Warranty Inactive Turfgrass Teaching Research Facility Ph 1 Academics Research The Turfgrass Teaching and Research Center project includes 6 5 acres on South Milledge Avenue that will serve as turf research test plots as well as support facilities Phase I of the project includes an equipment maintenance and storage building an irrigation pond and four turf plots Future phases include additional turf plots greenhouse and a demonstration three hole par 3 golf course Completed Warranty Inactive UGA Coastal Georgia Botanical Gardens Andrews Visitors Center 4H and other UGA Satellite Campuses This is a new building that will serve as a focal point for the UGA Bamboo Farm Coastal Gardens The new facility will house an information center gift shop film lecture room catering kitchen and a large multipurpose meeting room The project also includes an extension of the current public utilities and parking area Completed Warranty Inactive Rock Eagle Cabins Phase I 25 29 4H and other UGA Satellite Campuses The Rock Eagle 4 H Center project replaces 51 original cabins constructed in the late 1950s Phase I includes replacement of cabins 25 29 Cabins will contain 6 rooms to accommodate approximately 22 youths bunk beds or 12 adults They will also include a central meeting room Completed Warranty Inactive College of Pharmacy Renovation Final Phase Academics Research The RC Wilson Pharmacy Building renovation concerns labs 333 and 333A The renovation includes the removal and replacement of all finishes and casework in lab 333 and the removal and replacement of two fume hoods located in

    Original URL path: http://www.architects.uga.edu/projects/all?page=9&order=field_phase_value&sort=desc&field_status_value_many_to_one=All&field_phase_value_many_to_one=All&field_type_value_many_to_one=All (2015-06-04)
    Open archived version from archive

  • All Projects | University Architects
    academic achievements of the University of Georgia varsity student athletes Completed Warranty Inactive Sanford Stadium Scoreboard Improvements Athletics This project goal was to retrofit the viewing face of the Sanford Stadium main scoreboard to provide full screen opportunities for video displays Completed Warranty Inactive Stegeman Coliseum Sound System Improvements Athletics The goal of this project was to upgrade the Stegeman Coliseum arena sound system with a new center hung speaker cluster with sub woofer Completed Warranty Inactive UGA Housing Brown Hall Renovation Health Sciences Campus Formerly the Navy Supply Corps School barracks Brown Hall underwent a 2 4M renovation to make 200 beds available for UGA students The renovation plan included basic life safety electrical mechanical ADA fire code and other system upgrades The three story 48 959 square foot building went online for the fall semester of 2013 This project was funded by UGA Housing https housing uga edu residence tour health sciences campus brown Completed Warranty Inactive Tennis Upper Courts Improvements Athletics This project included renovations to the varsity upper tennis courts including ADA accessibility improvements and new additional seating Completed Warranty Inactive Soccer Field Improvements Athletics Improvements to the soccer fields included the following The soccer game field was studied and a new fixed irrigation system was installed A new sand silt drainage system was installed in the existing root zone and the entire field was sodded The perimeter netting and fencing was modified to accommodate the reconstruction of the field The soccer practice field had a new fixed irrigation system installed as well Completed Warranty Inactive Sanford Stadium Gate 10 Improvements Athletics This project improved the existing Gate 10 at Sanford Stadium The improvements provided upgraded gates and fencing as well as the addition of a large archway to highlight this entrance Graphics were added to

    Original URL path: http://www.architects.uga.edu/projects/all?page=10&order=field_phase_value&sort=desc&field_status_value_many_to_one=All&field_phase_value_many_to_one=All&field_type_value_many_to_one=All (2015-06-04)
    Open archived version from archive

  • All Projects | University Architects
    tutoring laboratories with demountable wall systems and integrated technology tables into the existing study hall space Completed Warranty Inactive Baseball Perimeter Improvements Athletics The Baseball Perimeter Improvement Project includes the renovation of the area behind the existing outfield fence and Kudzu Hill beyond the right field fence This project will include selective demolition grading for retaining walls walkways and stormwater management sidewalk and hardscape improvements minor utility improvements related to stormwater piping and relocation installation of site lighting soil erosion and sediment control and landscaping This project will also be replacing a large portion of the evergreen trees that reside against the outfield fence Completed Warranty Inactive Poultry Feed Mill for the Poultry Research Complex Academics Research This is the installation of new poultry feed mill equipment to replace most of the existing old and antiquated equipment It is an interior project that is taking place in an existing metal building This equipment provides poultry feed to the UGA researchers This facility is capable of providing several different specialty dietary mixes for different types of poultry research projects Completed Warranty Inactive Forestry Building Academics Research This will be a new 9 000 SF administrative building located on the Whitehall Forest Campus Completed Warranty Inactive Campus Upgrades Transit ADA Infrastructure Improvements Health Sciences Campus Completed Warranty Inactive UGA Housing McGowan Townhouse Renovations Health Sciences Campus Renovation of the 6 two story two bedroom townouses on McGowan Road The upgrades include newly drywalled interiors and neutral colored paint natural wood cabinets laminate kitchen counter tops and window blinds Completed Warranty Inactive Georgia Center Dogwood Courtyard Auxiliary Services Completed Warranty Inactive first previous 5 6 7 8 9 10 11 12 13 next last Design Construction Active Projects Academics Research Athletics Auxiliary Services Health Sciences Campus Historic Renovations Infrastructure Greenspace Student Affairs 4H

    Original URL path: http://www.architects.uga.edu/projects/all?page=11&order=field_phase_value&sort=desc&field_status_value_many_to_one=All&field_phase_value_many_to_one=All&field_type_value_many_to_one=All (2015-06-04)
    Open archived version from archive

  • All Projects | University Architects
    Inactive Burton 4 H Center Biltmore Hole Cabin Renovations 4H and other UGA Satellite Campuses Renovation of two Staff cabins at Burton 4 H Center Design Inactive Woodruff Practice Fields Improvements Athletics Renovation of the football practice fields to supply new synthetic turf 3 filming towers new fencing landscaping and the addition of 2 field lights Completed Warranty Inactive Health Sciences Campus Phase III IV Renovations Health Sciences Campus Renovation of HSC Hudson Hall Pound Hall and Wright Hall Completed Warranty Inactive Baseball Stadium Renovation Athletics The renovation of the Baseball Stadium included the reconstructing and expansion of the press box raising of the concourse level and expanding the dugout level through excavation The facility has two club areas one at the press level and a Dugout Club with seats directly behind home plate A centralized stairwell and the addition of an elevator provides convenient access to all levels of the stadium Completed Warranty Inactive Greenhouse Master Plan Infrastructure Greenspace A study to provide up to date greenhouse facilities and accommodate future development on main campus Planning Active Lumpkin Street Drainage Improvements Infrastructure Greenspace Phase II of Lumpkin Street water quality improvements in the Tanyard Creek watershed This project is a collaboration with Athens Clarke County Planning Active PVAC Corridor Infrastructure Greenspace Planning is underway on the pedestrian linkages through East Campus as construction is completed on the new Lamar Dodd School of Art Innovative water quality design and revised automobile and transit routes will be addressed Planning Active East Campus Master Plan Infrastructure Greenspace A master plan to improve pedestrian vehicular circulation and natural resources on East Campus View East Campus Public Input Map in a larger map Planning Active first previous 5 6 7 8 9 10 11 12 13 next last Design Construction Active Projects Academics Research

    Original URL path: http://www.architects.uga.edu/projects/all?page=9&order=field_status_value&sort=desc&field_status_value_many_to_one=All&field_phase_value_many_to_one=All&field_type_value_many_to_one=All (2015-06-04)
    Open archived version from archive

  • All Projects | University Architects
    Project include a new central mechanical system minor reconstruction in some existing office spaces and a new historically sensitive build out in the main foyer rotunda and adjacent wings Construction Active Dairy Farm Teaching Building Academics Research OUA is currently conducting a conceptual plan to renovate roughly 50 of the Dairy Farm Teaching Building which was built in the early 1970s Planning Active Rock Eagle Talmadge Auditorium Audio Visual Upgrades 4H and other UGA Satellite Campuses This project includes the replacement of existing audio visual systems in the Talmadge Auditorium Design Active Oglethorpe House Dormitory Renovation Student Affairs This project involves basic mechanical electrical and plumbing system upgrades as well as minor ADA and fire code upgrades to Oglethorpe House a 494 bed residence hall The project will be completed in two phases Summer 2013 and Summer 2014 in order to keep the facility in operation during the 2013 14 school year Design Active Terry College of Business Phase I Correll Hall Academics Research New construction for the Terry College of Business will provide facilities for the MBA program as well as other graduate programs and administrative support offices for the college This 74 200 square foot project represents the first phase of the planned three phase build out of the Business Learning Community Terry College s new home and academic complex that will anchor the university s northwest precinct Construction Active Sapelo Island Powerhouse 4H and other UGA Satellite Campuses The Sapelo Powerhouse renovation project is currently in Phase II Phase I addressed hazardous materials abatement demolition generator removal building envelope roof windows paint and prepping the slab Phase II will extend services to the building install MEP systems and install interior walls and finishes This project is still in preliminary stages Design Active first previous 5 6 7